How This Addition Stayed Cohesive
This project required careful coordination across structure, exterior transitions, and interior finish details. Preconstruction focused on sequencing and integration so the addition read as part of the original architecture instead of an obvious extension.
Detailed planning around deck integration, lighting placement, and interior connection points made it possible to keep the design language consistent while still improving functional space for everyday living and entertaining.
The final result feels original to the property, with scope decisions supporting both appearance and long-term usability.
- Structural and permit planning locked before field start
- Exterior material transitions coordinated for architectural continuity
- Lighting and ceiling detailing integrated into framing sequence
- Phase-level quality checks to protect finish precision